Some of the procedures that EU institutions put in place pose risks to the data protection rights and freedoms of individuals.

Under the old legal framework (Regulation (EC) 45/2001), EU institutions were obliged to notify us before putting in place risky data processing operations.

In general, our prior checking Opinions were public.

Regulation 2018/1725 builds on the old Regulation and mirrors the General Data Protection Regulation (EU) 2016/679 (GDPR) that applies to most organisations processing personal data in the Member States. Compared to the previous rules, Regulation 2018/1725 aligns documentation obligations more closely to the risks caused by processing personal data. This means for example that the documentation requirements for a EUI’s newsletter subscription will be lower than for a system using ‘intelligent CCTV’ covering publicly accessible space or a database profiling travellers for screening purposes.

Depending on the process at hand, EU institutions processing personal data ('controllers') may not have to go through all the steps below (these steps are described in the Accountability on the ground toolkit): 
• Generate basic documentation (called ‘records’) for all processes; 
• Check if the process is likely to result in high risks to the people whose data are processed and consult the DPO if it appears to do so; 
• If the EU institution needs to do a data protection impact assessment (DPIA), they analyse those risks in more detail and develop specific safeguards/controls to manage them; 
• If the results of the DPIA still indicate high residual data protection risks, the EU institution has to file a prior consultation with the EDPS (see Articles 40 and 90 of Regulation 2018/1725 respectively for administrative and operational personal data).

Article 39 of Regulation 2016/794 on Europol provides for an ad hoc prior consultation mechanism for new type of processing of operational data, namely data processed by Europol to support the Member States in preventing and combating serious crime and terrorism. Similarly, Article 72 of Regulation 2017/1939 on the European Public Prosecutor Office (EPPO) provides a specific prior consultation mechanism for the processing of operational data, namely data processed in the context of criminal investigations and prosecutions undertaken by the EPPO. Regulation 2018/1725, including the standard prior consultation mechanism, applies to Europol's and EPPO's processing of administrative data, which includes data on staff and visitors, for example.

Where an EU institution is unsure whether to notify us a data processing operation for prior consultation, their DPO can consult us for advice to confirm.

As for the old prior checking Opinions, in general the prior consultation Opinions are public, but we may delete sensitive elements where necessary, related to security for example. Some opinions, which are by nature sensitive, in particular in the police and justice area, may not be published. For the sake of transparency, these Opinions are summarised in our Annual Report.

Filters

4
Apr
2017

Promotion and reclassification - EMSA

Prior checking notification concerning promotion and reclassification at the European Maritime Safety Agency (Case 2016-0396)

4
Apr
2017

360° tool - feedback and leadership competencies - EC/OIB

Prior check opinion on the notification of the OIB’s "360° tool - feedback and leadership competencies” (Case 2016-1130 / DPO-3868.1)

The Office for Infrastructure and Logistics in Brussels (OIB) has a development programme for managers using a 360° feedback tool. Managers participate on a voluntary basis in the exercise, in which their staff members, peers and superiors who agree to give feedback get to rate the manager. This allows managers to obtain anonymous feedback on their management and leadership style and to improve their management and leadership skills.

Two external providers cooperate with OIB in this exercise: a subcontractor collects individual evaluation responses per line manager through an online questionnaire and automatically generates reports; the contractor provides for individual coaching sessions to the managers. The specific roles and tasks of these two processors should be are clearly mentioned in the data protection statement. The subcontractor’s data centre is located in the United Kingdom. Forwardlooking, the EDPS highlights that future transfers might come under Article 9 of the Regulation requiring an adequate level of protection within the recipient's legal framework for transfers to third countries. In this issue, see pp.12-13 of EDPS Position paper on transfers to third countries and international organisations by EU institutions and bodies.